1
/
of
6
Tops
TOPS Docket Gold Project Planner, 8-1/2" x 11-3/4", Top-Wire Bound, Project Rule, Poly Cover, 70 Sheets (99710) - White (Pack of 2)
TOPS Docket Gold Project Planner, 8-1/2" x 11-3/4", Top-Wire Bound, Project Rule, Poly Cover, 70 Sheets (99710) - White (Pack of 2)
Regular price
$72.95 USD
Regular price
$99.99 USD
Sale price
$72.95 USD
Unit price
/
per
Taxes included.
Shipping calculated at checkout.
Couldn't load pickup availability
Brand: Tops
Color: White
Features:
- The information below is per-pack only
- Project ruling provides instant organization for notes, plans & deadlines
- Premium-weight paper is Letr-Trim perforated to detach easily
- Top-bound snag-resistant coil & extra-strong back are ideal for notes on the go
- Poly cover, 8-1/2" x 11-3/4", 70 sheets
- Proudly made in the USA
Binding: Product Bundle
Format: Notebook
Release Date: 04-04-2023
model number: 99710
Part Number: 99710
Details: The TOPS Docket Gold Project Planner is an 8.5 x 11.75 inch planner made in the USA. It contains 70 sheets of premium paper that are perforated for easy note taking and organization. This planner has a solid color white cover and is designed for birthdays. It can be used to keep track of important dates and deadlines. The pages are pre-printed with a plain ruling that allows notes to be added on top. This planner is ideal for staying organized and on top of important tasks and appointments.
Package Dimensions: 12.0 x 8.5 x 0.6 inches
Share
