Skip to product information
1 of 6

Lincia

Lincia Large Magnetic Project Planning Dry-Erase Board 24" x 36" Reusable Make Ready Board Property Management Office Whiteboard for Wall Project Planner for Managers & Entrepreneurs

Lincia Large Magnetic Project Planning Dry-Erase Board 24" x 36" Reusable Make Ready Board Property Management Office Whiteboard for Wall Project Planner for Managers & Entrepreneurs

Regular price $74.95 USD
Regular price $102.99 USD Sale price $74.95 USD
Sale Sold out
Taxes included. Shipping calculated at checkout.

Brand: Lincia

Features:

  • Packages Includes: you will receive 1 magnetic task tracking poster with a size of 24 x 36 in, a Flannel blue and yellow wave eraser, 100 pages of arrow sticky notes, 1 Magnetic pen holder, a roll of Nano traceless double-sided tape and 6 colored erasable whiteboard pens
  • Reusable and Quality: the task tracking whiteboard planner is made of magnetic material; With dry-erase design, write and wipe with ease, We can erase easily even months later and use this work schedule board over and over again
  • Productive Project Management Tools: this project management board is a game changer and something physical for managing personal or team projects efficiently; It allows you or members to quickly view and share the status of up to 20 projects at the same time, a very good practical kit of team building
  • Mounting is a Breeze: this vision board is lightweight and can be attached magnetically or with nano-traceless double-sided tape; ; You can mount this Board or take it down easily without tools; Notice : before use, please place heavy objects at the four corners of the poster and let it sit for 12-24 hours until the poster is flat again
  • Practical and Versatile: it's easy to use for products development, marketing strategic projects or as a sales goal whiteboard for daily use in office, home or family; Whatever for entrepreneurs, managers or person working at home, buy the office white board for wall for try

model number: XIA-Lincia-2994

Part Number: XIA-Lincia-2994

Details: Features:

Office Essentials:
This project organizer worth the investment for business use. It's easy to use for products development, marketing strategic projects or as a sales goal tracking whiteboard. It helps you plan, execute, assign tasks efficiently.

Management Planner:
It comes rolled in a study tube with dry-erase markers, eraser, reusable fluorescent colored tabs. (you can use heavy objects to press the dead corners to restore the flat state).

Specifications:
Material: magnetic
Color: multicolor
Size: about 24 x 36 inches/ 91 x 61cm

Package includes:
1 x Plastic whiteboard
1 x Whiteboard eraser
100 x Sticky notes
1 x Magnetic Pen Box
1 x Double sided tape
6 x Colored erasable whiteboard pens

Notes:
Manual measurement, please allow slight errors on size.
The color may exist a slight difference due to different screen displays.
Our products have strong adhesive, please do not stick them on the paper cabinet, paint cabinet, in case of damage to the furniture.

Package Dimensions: 23.8 x 2.4 x 2.3 inches

View full details